| Cost Centers for Medical Gas Shutdowns |
HOSPITAL |
SMART TAP |
Planning Shutdown |
Time, management spends on coordination and scheduling |
NONE |
Respiratory Staff |
Depends on area of SHUTDOWN |
NONE |
Nursing Staff |
Depends on area of SHUTDOWN |
NONE |
Maintenance Staff |
Extra staff to monitor shut down areas, and closed
valves |
NONE |
Contractor costs |
Contractor Cost depends on size of shutdown. Usually
4 to 6 people |
2 to 3 people |
Certification |
The entire area that was shutdown, which may include
entire hospital |
Just within the area of piping where the SMART Tap
Procedure was performed |
Outside Company or hospital supplied back up high
pressure cylinders and rental of regulators, hoses, carts, stands,
and demurrage on cylinders |
As High as $100 per room |
Included in cost. Only low pressure backup with safeties
installed or hospital main medical gas system used. Calculated for
demand usage. |
Liability of removing patients from wall outlets and
connecting them to cylinders |
Insurance Policy Deductible |
NONE |
Liability of high pressure cylinder regulator failing
and destroying gas piping and patients connected to them |
Insurance Policy Deductible |
NONE |
Disruption of normal work routine at hospital |
Worry about running out of back up gas, nursing and
respiratory departments are not doing their normal patient care duties |
NONE |
Missed Opportunities |
During shutdown of an area, the area is not available
for patients or procedures |
NONE |